# GST on an under-construction flat: 1%, 5%, or none

GST is one of the larger charges on a flat bought off plan, and it is paid in step with the instalments. Whether it is 1%, 5% or nothing depends on three facts about the flat.

## The short answer

A flat bought before its completion certificate carries GST of 5% of the total price, or 1% if it is an affordable home, with no input tax credit for the builder. Affordable means a carpet area of up to 60 square metres in the metropolitan areas named in the rules, or 90 elsewhere, and a price of no more than ₹45 lakh. A flat sold after the completion certificate, with the whole price received after it, carries no GST.

## The two rates

**GST on residential flats from 1 April 2019**

| Flat | GST on the total price |
| --- | --- |
| Affordable residential apartment | 1% |
| Any other residential apartment | 5% |

Both are effective rates on the whole price. The law treats a third of the price as the value of the land, which carries no GST, and taxes the rest at a higher rate that works out to 1% or 5% of the total. The builder cannot set input tax credit against either, which is why they are lower than the 8% and 12% charged before April 2019.

## What counts as an affordable home

Both conditions have to be met.

- A carpet area of up to 60 square metres in a metropolitan area, or up to 90 square metres anywhere else, villages included.
- A price charged by the builder of no more than ₹45 lakh.
- The metropolitan areas are Bengaluru, Chennai, Delhi NCR (Delhi, Noida, Greater Noida, Ghaziabad, Gurgaon and Faridabad), Hyderabad, Kolkata and the whole Mumbai Metropolitan Region.

## When there is no GST

GST applies to the construction of a flat for sale. Once the completion certificate is issued, or the building is first occupied if that comes sooner, a flat sold with the whole price received after that date is the sale of a building, which GST does not reach. A completed flat resold by its owner carries no GST for the same reason.

> **Stamp duty is separate.** Stamp duty and registration are charged by the state on the agreement, not by the builder, and are not part of GST. Budget for both on top of the price and the GST.

## A worked example

Three flats, each bought under construction. Pune is not one of the named metropolitan areas; Thane is part of the Mumbai Metropolitan Region, which is.

**Which rate applies, and what it comes to**

| Flat | Carpet area | Price | Rate | GST |
| --- | --- | --- | --- | --- |
| Pune | 75 sq m | ₹60,00,000 | 5% | ₹3,00,000 |
| Pune | 85 sq m | ₹40,00,000 | 1% | ₹40,000 |
| Thane | 62 sq m | ₹40,00,000 | 5% | ₹2,00,000 |

The first flat costs more than ₹45 lakh, so it is not affordable whatever its size. The second is under both limits. The third costs the same as the second but is two square metres over the 60 square metre limit for a metropolitan area, which moves it from 1% to 5% and adds ₹1,60,000 of GST.

## How it is paid, and what it does to the true cost

GST is charged on each demand the builder raises, so it is paid in step with a construction-linked plan rather than in one sum at the end. Like every instalment, the GST paid years before possession ties up money that would otherwise earn a return or reduce a loan, which is part of a flat’s true cost.

Work it out on your own figures: [GST on an under-construction flat calculator](https://www.thefinanceintelligence.com/calculators/gst-on-flat).

## Questions

### Is GST charged on stamp duty and registration?

No. Stamp duty and registration are state charges on the agreement, paid separately. GST is charged on the price the builder charges for the flat.

### Is there GST on a ready-to-move flat?

Not if the completion certificate has been issued, or the building first occupied, and the whole price is received after that. If any part of the price was received before, the sale is taxed.

### Is there GST on a resale flat?

Not on a completed flat sold by its owner. That is the sale of a building, which is outside GST.

### Why did GST on flats fall from 12% to 5%?

From 1 April 2019 the rates were cut to 5%, and 1% for affordable homes, with the condition that the builder takes no input tax credit. Before that the rates were 12% and 8% with credit.

## Sources

- [Frequently asked questions on the real estate sector (GST rates from 1 April 2019)](https://www.gstcouncil.gov.in/sites/default/files/2024-02/faq-real-estate-sector.pdf), GST Council
- [Press release on the 34th meeting of the GST Council: rates for residential real estate](https://gstcouncil.gov.in/sites/default/files/2024-10/34th_gst_press_information_bureau.pdf), GST Council and the Press Information Bureau

The tool this guide leads to: [True Property Cost](https://www.thefinanceintelligence.com/tools/true-property-cost).

---

Source: https://www.thefinanceintelligence.com/guides/gst-on-under-construction-flat (updated 2026-10-28)
The Finance Intelligence is a set of web tools, free calculators and guides for finance work in India, built by chartered accountants. Contact: team@thefinanceintelligence.com.
